Challenger App

No.1 PSC Learning App

1M+ Downloads
From septic tank the effluents are discharged in to

ADrainage

BSoak pit

CSewer

DOxidation pond

Answer:

B. Soak pit


Related Questions:

Quick return mechanism is provided on shaper to reduce the time required for
Rio Summit was held at_____
The maximum bending moment at the fixed end of a cantilever beam, with a uniformly distributed load, for the entire span is
Hooke's law is applicable to
In an Otto cycle the heat addition is assumed to be at: