Challenger App
Home
Exams
Questions
Quiz
Notes
Blog
Contact Us
e-Book
×
Home
Exams
▼
Questions
Quiz
Notes
Blog
Contact Us
e-Book
Home
/
Questions
/
Building Materials and Construction
No.1 PSC Learning App
★
★
★
★
★
1M+ Downloads
Get App
The type of masonry in which the stones are fine chisel dressed and the thickness of joints does not exceed 3 mm is called
Open
Question
A projection of masonry built into the back of a wall is
Open
Question
For volume computation of earth format the most reliable formula used is
Open
Question
Final setting time of ordinary Portland cement is
Open
Question
Minimum thickness of stone masonry is
Open
Question
Depth of foundation is found out by a
Open
Question
The quantity of mortar required for standard unit of brick work in CM 1:6
Open
Question
The vertical member which is employed to sub divides a window or door vertically
Open
Question
A brick lald with its length parallel to the face or direction of wall
Open
Question
The instrument used to determine the consistency of cement
Open
Question
The lime which are obtained by the calcinations of comparatively pure lime stone is known as
Open
Question
In the design of footing, to check shear for two way shear the critical section shall be taken a distance of
Open
Question
The test conducted to determine the quantity of water to be added in cement to form standard paste
Open
Question
To slow down the initial setting time of cement the compound responsible is
Open
Question
Addition of pozzolona to cement causes all of the following except
Open
Question
A good brick should not absorb water more than
Open
Question
The function in which a cantilever beam provided to join two footing is known as
Open
Question
The window which is provided on a sloping roof of a building is called:
Open
Question
A cut in frame of window to receive the shutter is called
Open
Question
Mortar in which both cement and lime are used as binding material is called
Open
Question
Ornamental moulded course placed on the top of wall is
Open
Question
A Raft foundation is called floating foundation when
Open
Question
When clay contains excess alumina is used For bricks
Open
Question
An ordinary Portland cement when tested for fineness on IS sieve number 9 will leave residue to an extend of
Open
Question
The setting of hydraulic lime and cement is facilitated by the presence of
Open
Question
Refractory bricks resist
Open
Question
The hydration of cement takes place, in the presence of water, during concrete setting,over a period of
Open
Question
The weight of 1 m of Portland cement is
Open
Question
In plastering of walls, using cement mortar,the suitable mix proportion of cement andsand is
Open
Question
The vertical outside member of a door or window shutter is known as
Open
Question
The commonly adapted, nominal size of traditional brick
Open
Question
A covering of stone, placed on the exposed top of a wall, to prevent seepage of water,is termed as
Open
Question
The example for a 'Deep Foundation' is
Open
Question
The nominal mix of cement concrete,corresponding approximately to the grade m20 is
Open
Question
The manufacture of cement, burning process is carried out in a
Open
Question
Which of the following, is not a constituent of good brick earth
Open
Question
White cement should have least percentage of
Open
Question
For construction of structures under water the lime used is
Open
Question
Quick lime if left exposed to air
Open
Question
Fire bricks are always set in a mortar of
Open
Question
Bricks containing relatively large proportion of soluble salts are liable to become discoloured by formation of a white deposit known as
Open
Question
The lime which contains high percentage of calcium oxide, is called
Open
Question
The chemical action between lime and water technically known as
Open
Question
Pile foundation is generally provided if soil is
Open
Question
The commonly used raw material in the manufacture of cement is
Open
Question
Which of the following cement suitable for us in massive concrete structures such as dam
Open
Question
The internal size of mould used in brick preparation is
Open
Question
The window which projects outside the room of a building for admitting more light and air is known as
Open
Question
The stone masonry in which stone of same height are laid in layers is called
Open
Question
The placing of new foundation below an existing foundation for strengthening the existing foundation is known as
Open
Question
‹ Previous Page
Next Page ›