App Logo

No.1 PSC Learning App

1M+ Downloads
12 പേർ 24 ദിവസം കൊണ്ട് തീർക്കുന്ന ഒരു ജോലി 16 പേർ എത്ര ദിവസം കൊണ്ട് തീർക്കും ?

A15

B20

C18

D16

Answer:

C. 18


Related Questions:

Mainspring and carriage is connected with:
Which method is used for balancing the traverse when angular and linear measurements are equally precise ?
The lighter colored outer annual rings constitute the
If thirty observation have an average of 20 and 20 observations have a mean of 30 then what is the average of all observations?
While drilling in lathe, the drill is held in the