App Logo

No.1 PSC Learning App

1M+ Downloads
12 പേർ 24 ദിവസം കൊണ്ട് തീർക്കുന്ന ഒരു ജോലി 16 പേർ എത്ര ദിവസം കൊണ്ട് തീർക്കും ?

A15

B20

C18

D16

Answer:

C. 18


Related Questions:

Forces, whose lines of action, meet at a point when produced are known as
In a fillet weld the weakest section is the
ISMC indicates:
In moment distribution method, the sum of distribution factors of all the members meeting at any joint is always
The point of application of total pressure on the surface of fluid is known as: