Challenger App

No.1 PSC Learning App

1M+ Downloads
3 + [2 1/3 + (3 1/2 -(2 1/3 + 1 1/2))] =

A3

B5

C3 1/2

D2 1/3

Answer:

B. 5


Related Questions:

The method in which the approximate cost of a project is arrived based on its service unit method
The highest point of the extrados of an arch
Prismatic compass is used to determine
How many satellites were launched by PSLV C 34 on its mission
In Malabar, the Salt Satyagraha was led by