Challenger App

No.1 PSC Learning App

1M+ Downloads
A canal constructed for the diversion of floodwater of river is called

ARidge canal

BDistribution canal

CPerennial canal

DInundation canal

Answer:

D. Inundation canal


Related Questions:

A propped cantilever of span L carries a uniformly distributed load of' W' per unit run over its entire span. The value of prop reaction to keep the beam horizontal is:
A gradient steeper than ruling gradient where it is not possible due to topography is.........................................
How many radians are in a full circle
The most important line in a survey is
The oral evidence shall be _______