App Logo

No.1 PSC Learning App

1M+ Downloads
A first sight taken on a leveling staff held at a point of known elevation is termed as

ABack sight

BFore sight

CIntermediate sight

DLine of sight

Answer:

A. Back sight


Related Questions:

One of the following component is not related to plate girder
Moment required at one end of a member to produce unit angle of rotation at that end is called
The type of irrigation in which water is available for irrigation throughout the year
Permeability of soil is:
Live load for class room building is