Challenger App

No.1 PSC Learning App

1M+ Downloads
A relatively fixed point of known elevation above datum, is called

ADatum point

BBench mark

CReduced level

DReference point

Answer:

B. Bench mark


Related Questions:

Ratio of distance moved by effort to the distance moved by load is:
The method of leveling for determining the difference in elevation of two points either too far apart or obstructed by an intervening ground is known as
If cant provided at horizontal curve is maximum designed then it is called.................................................
For a simply supported beam with a central load the bending moments is
In a segmental arch, the centre of the arch lies: