A slab of 5.05 m * 3.05 m and thickness 100 mm is provided with a main bar of 10 mm dia @ 200 mm c/c and distributing bar 8 mm dia at 200 mm c/c with a cover of 25 mm.The number of main reinforcement is

A25

B26

C24

D16

Answer:

B. 26