Challenger App

No.1 PSC Learning App

1M+ Downloads
A solid construction put across the river to raise its water level and divert the water into the canal known as:

AWeir

BMarginal bund

CBarrage

DDarn

Answer:

A. Weir


Related Questions:

The best irrigation method that suits are where scarcity of irrigation water is
The flow duration curve is a plot of:
Margin between water level and top of dam is called
Volume of water stored in a reservoir between minimum pool level and normal pool level is..................................
The main function of a diversion headwork of canal form river is: