Challenger App

No.1 PSC Learning App

1M+ Downloads
A temporary structure erected for providing a safe working platform:

ACentering

BRaking

CShoring

DScaffolding

Answer:

D. Scaffolding


Related Questions:

Heat and work are:
The type of bond in which every course contains both headers and stretchers, is called
In conic sections, if the section is parallel to the axis of the cone then it will be
The circle of contact of earth and the cone of visual rays passing through the point of observation is called
Which water supply distribution system is suitable for towns growing irregularly?