App Logo

No.1 PSC Learning App

1M+ Downloads
A temporary structure erected for providing a safe working platform

ACentering

BShoring

CRaking

DScaffolding

Answer:

D. Scaffolding


Related Questions:

When it is not possible to set up the level midway between two points. The method of levelling to carry forward the levels on the other side of the obstruction is called:
The ratio of maximum deflection of a beam to its span is called
_____________ is a United Nations Conference on Environment and Development.
A conic section which have only one directrix is
Slip of a belt is usually expressed in