App Logo

No.1 PSC Learning App

1M+ Downloads
A type of bonding in which all courses are laid as headers

AStretcher bond

BFlemish bond

CDutch bond

DHeader bond

Answer:

D. Header bond


Related Questions:

The failure of a pile foundation is due to
In the design of footing, to check shear for two way shear the critical section shall be taken a distance of
One through-stone is placed for every area of rubble masonry
The type of bond provided in brick masonry for carrying heavy loads is
An ornamental projection from the phase of a wall is :