Challenger App

No.1 PSC Learning App

1M+ Downloads
Advanced starter signal is used for:

APassenger train

BGoods train

CLoco-shed

DShunting

Answer:

D. Shunting


Related Questions:

The standard dimensions of a wooden sleeper for a B.G. railway track are
The main function of sleepers is
The standard length of the rail for broad gauge track is:
The standard length of rail section for broad gauge rail is:
Method of laying the track over the prepared formation is known as: