App Logo

No.1 PSC Learning App

1M+ Downloads
All the type bars are to be struck at

AMiddle Point

BCentre guide

CCylinder

DCard holder

Answer:

B. Centre guide


Related Questions:

As per 15 specification full strength of concrete is achieved after
Placing of concrete should be done at a temperature
The value of Vee-Bee time for low workability as per Indian Standards is prescribed as:
Which one of the following act as an admixture in ordinary concrete?
The defect caused during seasoning of timber in called