App Logo

No.1 PSC Learning App

1M+ Downloads
An earthwork raised above the natural ground by the deposition of material to support construction at a higher level is known as

ASpoil

BBenching

CSpoil Bank

DEmbankment

Answer:

D. Embankment


Related Questions:

Rain shadow region is formed in the:
Relation between Young's modulus and cube strength of concrete is:

Directions: In the question below is given a statement followed by two conclusions numbered I and II. You have to assume everything in the statement to be true, then consider the two conclusions together and decide which of them logically follow beyond a reasonable doubt from the information given in the statement. Give answer.

Statements: The old order changeth, yielding place to new.

Conclusions:

I. Change is the law of nature.

II. Discard old ideas.

Hydrology deals with:
Pitot tube is used for measurement of