Challenger App

No.1 PSC Learning App

1M+ Downloads
___________arch is built over a lintel or a flat arch to relieve the latter of the superincumbent weight.

AJack arches

BSegmental arch

CRelieving arch

DNone of the above

Answer:

C. Relieving arch


Related Questions:

The curtain walls carries:
In two phase system, the phase will differ by an angle of
The ratio of lateral strain to linear strain within the elastic limit
Depression between summits is called:
Amber colour of a coloured light traffic signal in a junction indicates: