App Logo

No.1 PSC Learning App

1M+ Downloads
Auger boring may be of:

APost-hole type

BWell

CTube type

DPile

Answer:

A. Post-hole type


Related Questions:

The horizontal platform provided in between any two flights of a stair is called:
Glass window fitted along the slope of pitched roof
When the full brick is laid with its length parallel to the face of wall is called
The horizontal surface parallel to the direction of layers of stone formation is called
Which foundation is suitable to take heavy concentrated load at shallow depth