App Logo

No.1 PSC Learning App

1M+ Downloads
Concrete for road construction recommended slump is

A40 to 50

B80 to 100

C40 to 60

D20 to 40

Answer:

D. 20 to 40


Related Questions:

A road connecting one town with another is called:
Off tracking distance is also called:
Which type of roads can be utilized during monsoon?
The owner of land along a highway route has to leave a certain setback or margin from the road boundary for his construction.This imaginary line is called:
The boundaries between the pavement and footpath of the road is: