App Logo

No.1 PSC Learning App

1M+ Downloads
Construction of temporary structure to support an unsafe structure is known as

AShoring

BUnderpinning

CScaffolding

DPropping

Answer:

A. Shoring


Related Questions:

The separation of coarse aggregate from concrete during its transportation is known as
'Advaitha Chintha Padhadhi' is the literary work of
---------- process needs no quenching
Chemical oxygen demand(COD)of a sample is always greater than Biochemical Oxygen Demand(BOD)since it represents:
If the length of a chain is actually longer than designated, then the measured distance comes to be