Challenger App

No.1 PSC Learning App

1M+ Downloads
CPRF stands for:

ACombined Plain Round Foundation

BConnected Pile Round Foundation

CCombined Pile Raft Foundation

DCorrosion Proof Raft Foundation

Answer:

C. Combined Pile Raft Foundation


Related Questions:

Which of the following common material is used for damp proofing?
In raking the bottom of the raker is rest on :
Allotment of an Indira Awaas Yojana (TAY) house :
A circular ring is having outside diameter 8cm and inside diameter 6 cm. What should be the area?
When it is not possible to set up the level midway between two points. The method of levelling to carry forward the levels on the other side of the obstruction is called: