App Logo

No.1 PSC Learning App

1M+ Downloads
Detention period of grit chambers is kept as:

A12 hours

B5 minutes

C24 hours

D1 minute

Answer:

D. 1 minute


Related Questions:

The operation of excavating and shaping the surface or earthwork
Slump test is performed in concrete mix to determine the
A low height Wall constructed along the edge of the roof is called
The maximum particle size of fine aggregate is
The type of bond is which every course contains both course contains both headers and strechers is called