App Logo

No.1 PSC Learning App

1M+ Downloads
Error due to bad ranging is

Acumulative, positive

Bcumulative, negative

CCompensating

Dboth (1) and (2)

Answer:

A. cumulative, positive


Related Questions:

First observation taken on turning point is
The operation of establishing intermediate points in survey line with end points :
In order to determine the natural features such as valleys, rivers, lakes, etc. The surveying preferred is
The horizon glass in an optical square is :
n which system, the bearing of a line is measured with magnetic north in clockwise direction?