Challenger App

No.1 PSC Learning App

1M+ Downloads
For making 100 m of C.C 1:1.5:3 the broken stone required is:

A0.95 m^3

B0.90 m^3

C95 m^3

D90 m^3

Answer:

D. 90 m^3


Related Questions:

A project may consist of several small works and each of the work is called:
The method of survey in which the curvature of the earth is taken into account
Which method of milling process is producing flat surface parallel to the column ?
What is the systematic departure of the declination from its mean value during a period of 24 hour?
Polar co-ordinates are used mostly for drawing