App Logo

No.1 PSC Learning App

1M+ Downloads
For measurement of area of plastering work no deduction shall be made for the opening up to

A1.0 m²

B3.0 m²

C1.5 m²

D0.5 m²

Answer:

D. 0.5 m²


Related Questions:

An under reamed pile is a:

Which of the following is not the use of bleaching powder?

(i) to make drinking water free from germs

(ii) in soda-acid fire extinguishers

(iii) as an oxidising agent in many chemical industries

(iv) for baking cakes

The removal of excess chlorine from water is known as
In R.C.beams shear cracks appear as
The least count of prismatic compass is