App Logo

No.1 PSC Learning App

1M+ Downloads
For the preparation of high way project

ALongitudinal and cross sections are required

BCross sections are required

CLongitude sections are required

DNone of these required

Answer:

A. Longitudinal and cross sections are required


Related Questions:

The latitude and departure of a traverse line are both + ve, when the whole circle bearing of the line lies in between
Clayey soils are best compacted by:
The maximum strain energy that can be stored in an elastic member without exceeding its elastic limit
The area where the agriculture can be done satisfactorily
An artificial activity which indicates that an activity following it cannot be started unless the preceding activity is complete is known as