Challenger App

No.1 PSC Learning App

1M+ Downloads
If the water for irrigation has to be lifted before it runs field is

AFlow irrigation

BPerennial irrigation

CSprinkler irrigation

DLift irrigation

Answer:

D. Lift irrigation


Related Questions:

Which method gives more accurate results in the measurement of areas
The bond consisting of alternate courses of headers and structures is called
A rectangular beam 20 cm wide is subjected to a maximum shearing force of 10000 kg,the corresponding maximum shear stress being 30 kg/cm². The depth of the beam is
Three forces which act on a rigid body to keep it in equilibrium the forces must be
Cleaning of rapid sand filters is done by