In an MRP system, component demand is

AForecasted

BEstablished by the master production schedule

CCalculated by the MRP system from the master production schedule

DIgnored

Answer:

C. Calculated by the MRP system from the master production schedule

Read Explanation:

In an MRP system, component demand is calculated from the master production schedule. This ensures that the materials required for production are accurately determined based on the planned production activities. By relying on the master production schedule, the MRP system can effectively manage inventory levels and production timelines.


Related Questions:

Travel chart mainly helps
Which one of the following is not a characteristic of JIT manufacturing system?
Which of the following is a type of indirect inventory?
During the development of a product an entirely new process plan is made based on design logic, examination of geometry and tolerance information. This type of process planning is known as
The process of fixing the sequence of operations and material flow is