In D-Type plot the permissible covered area is of the site area.

A60%

B50%

C40%

D30%

Answer:

A. 60%


Related Questions:

A model of a reservoir is emptied in 10 minutes, If the model scale is 1:25 the time taken by the prototype to empty itself would be
Art of determining the present value of a property is
A structure which takes out slit from a canal is called
The bridge constructed by two or more hanging cables in a curve shape and supporting the roadway is called:
To construct 10 cm thick partition wall you will select