App Logo

No.1 PSC Learning App

1M+ Downloads
In hydro power plant the pipe carrying water from the reservoir to the turbine

ASuction pipe

BPenstock

CDraft tube

DTurbine.

Answer:

B. Penstock


Related Questions:

Anti-siphonage pipe is connected to
The stress which is considered as the allowable stress for design purpose
Hydraulic gradient line represents the sum of
The treated water is supplied to the consumers during certain fixed hours of the day
Which part is not connected with the bell ?