Challenger App

No.1 PSC Learning App

1M+ Downloads
In surveying the relative position of points are located by measurement from at least

AThree point of reference

BTwo point of reference

CFive point of reference

Dfour point of reference

Answer:

B. Two point of reference


Related Questions:

The B.M diagram of a fixed beam is obtained by superimposing its
The deposition of alkali salts on the inside walls of a tube well is known as
The operation of excavating and shaping the surface or earthwork
Slate is formed by the metamorphic action on
The still water surface of a pond represent a..... surface