Challenger App

No.1 PSC Learning App

1M+ Downloads
In the specification of earth work, initial lead is specified as

A10 meter

B30 meter

C20 metre

D1.5 metre

Answer:

B. 30 meter


Related Questions:

The least count of theodolite in measuring angle is
The wall constructed with stone to protect slopes of cutting in natural ground from the action of weathering agencies is called
Name the Araya community leader who wrote 'Jatikkummi' against caste evils?
Wired glass is prepared by embedding wire- netting in glass plate
Non-uniform flow may caused by: