App Logo

No.1 PSC Learning App

1M+ Downloads
Initial lead for earth work excavation is

A1.5 m

B30 m

C100 m

D50 m

Answer:

D. 50 m


Related Questions:

For the same tension and coefficient of friction, the type of belt which can transmit more power is
A cantilever retaining wall should not be used for height more than
The maximum pressure which soil can carry without shear failure, is called
The obstacle, which obstructs vision not chaining is a:
The radius of a circular sector is doubled.The area will be increased how many times: