App Logo

No.1 PSC Learning App

1M+ Downloads
Initial lead for earth work excavation is

A1.5 m

B30 m

C100 m

D50 m

Answer:

D. 50 m


Related Questions:

A camber consisting of two straight slopes joining at the centre is called:
Variation in declination due to magnetic storms, earthquakes and other solar influences are called
The magnetic bearing of a line is 54° 30' and the magnetic declination is 4° 30'west. The true bearing of a line will be
In a whole circle bearing system, maximum value of bearing is
The upper plate of a leveling head of aa level is known as: