Challenger App

No.1 PSC Learning App

1M+ Downloads
It is more difficult to obtain good results while measuring horizontal distance by stepping

Aup hill

Bin low undulations

Cdown hill

Din plane areas particle

Answer:

A. up hill


Related Questions:

In public buildings the maximum riser is limited to
In cantilever beams, compression is developed at the
The space housing the stairs is called
Black marble is generally found in the district of
A Line is parallel to both the HP and VP. Its projection is