Challenger App

No.1 PSC Learning App

1M+ Downloads
It is provided to reduce the water hammer pressure formed in the penstock in hydroelectric project:

ATurbine

BSurge tank

CFore bay

DIntake

Answer:

B. Surge tank


Related Questions:

The different in elevation of the top of bank and full supply level of a canal is called a
It is a structure in which the canal flows over the drainage:
Which dams are made of locally available soils and gravels ?
It is provided to reduce the water hammer pressure formed in the penstock in hydroelectric project
Channel is a passage through which water flows under: