App Logo

No.1 PSC Learning App

1M+ Downloads
Key plans are drawn

ANot to scale

B1:400 scale

C1:800 scale

D1:1000 Scale

Answer:

A. Not to scale


Related Questions:

In chain surveying perpendicular to chain linear arc set out by :
At magnetic poles dip of a magnetic needle is
The method of surveying in which field work and plotting work are done simultaneously, is called
Intersection method of detailed plotting is most suitable for
When a canal and river happen to meet at the seine level then :