Levelling carried out along the given route to find the elevation of points at known distances is called:

ADifferential levelling

BProfile levelling

CFly levelling

DTrigonometric levelling

Answer:

B. Profile levelling


Related Questions:

A staff reading taken on a Bench-mark should be 2.627. Its reduced level is 150 m. What should be the height of instrument?
What type of acid-base imbalance is most likely to experience in patients with Chronic Obstructive Pulmonary Disease (COPD)
The effective length of a fillet weld is said to be
A line which joins subsidiary stations on the main lines of a chain survey network and serves to facilitate taking offsets to the objects located at great distance from the main survey lines is called
A simply supported beam of span l and flexural rigidity EL Carries a unit point load at its center. the strain energy in the beam due to bending is