App Logo

No.1 PSC Learning App

1M+ Downloads
Live load or imposed load is to be taken as per

AIS: 456

BIS: 800

CIS: 801

DIS: 875

Answer:

D. IS: 875


Related Questions:

For ordinary RCC work in a building, proportion of concrete is generally:
In two way slab the reinforcements in the shorter span are in the longer span
The main reinforcement in a simply supported RCC member placed at
The workability of concrete can be increased by which of the following?
According to Indian standard specifications, the temperature for curing is