Materials Requirement Planning is driven by

AMaster Production Schedule

Btotal quality measurement

Coverall production planning

Doverall inventory planning

Answer:

A. Master Production Schedule

Read Explanation:

Materials Requirement Planning (MRP) is a crucial component in manufacturing and production management. It is primarily driven by a detailed schedule that outlines the specific products to be produced, the quantities required, and the timeline for production. This schedule ensures that materials are available for production at the right time, minimizing inventory costs and optimizing production efficiency.


Related Questions:

Which one of the following scheduling measures is not related to due date or delivery time?
The difference between the actual demand for any time period and the forecast for the same period is termed as
Productivity can be improved by
Gantt chart is applicable for
Which one of the following is correct? Production, planning and control functions are extremely complex in