Materials requirements planning is driven by

Amaster production schedule

Btotal quality measurement

Coverall production planning

Doverall inventory planning

Answer:

A. master production schedule

Read Explanation:

Material Requirement Planning (MRP) is a method used to ensure that all necessary materials and sub-assemblies are available at the appropriate time for production. The Master Production Schedule (MPS) is a complete timetable of scheduled production that drives MRP. The Inventory Record File provides up-to-date inventory information, while the Bill of Material specifies how each final product is manufactured.


Related Questions:

Fixed cost of an equipment is Rs. 6,000, if variable cost of an item it produces is Rs. 2 per item and sells it for Rs. 7 per item, what is the break-even point?
Which of the following is a type of pre-emptive job scheduling done by the operating systems?
Performance rating of an employee may be expressed as:
Tracking signal is used in the context of
ABC analysis is used in