Most accurate method ofestimation is based on

ABuilding cost index estimate

BPlinth area estimate

CDetailed estimate

DCube rate estimate

Answer:

C. Detailed estimate


Related Questions:

For one cubic meter, 1: 2: 4 concrete using 20 mm metal, the quantity of coarse aggregate required is
A link of a metric chain is cm in length
The fixed support in a real beam becomes in the conjugate beam a
The working edge of the alidade
In prismatic compass, the magnetic needle used is