Challenger App

No.1 PSC Learning App

1M+ Downloads
PERT analysis is based on:

AOptimistic time

BPessimistic time

CMost likely time

DAll the above

Answer:

D. All the above


Related Questions:

PERT stands for :
Which one of the following estimates is prepared for technical sanction of the competent authority
Area of the horizontal circulation may constitute about ........................of the total plan area of a residential building
Plinth area method is a method of________________
While submitting a tender the contractor is to deposit 2% of estimated cost as