Pick up the portion not included in plinth area

AWall

BRoom

CVerandah

DCourtyard

Answer:

D. Courtyard


Related Questions:

The maximum settlement of raft foundation on clayey soil should be limited to
For masonry work with solid bricks consistency of mortar should be
The type of bond provided in brick masonry for carrying heavy loads is
Ornamental moulded course placed on the top of wall is
In the construction of arches, sand box method is used for