App Logo

No.1 PSC Learning App

1M+ Downloads
Placing of concrete should be done at a temperature

A0°C

B10°C

C20°C

D27+- 20°C

Answer:

D. 27+- 20°C


Related Questions:

Forms of freshly laid rcc work should not be struck for a period called .............................. until the concrete has reached a strength at least twice the stress to which the concrete may be subjected to at the time of removal of form work.
Compared to mild steel the Steel used for prestressing of concrete beam has:(
Common fine aggregate used in concrete
Flexural strength of M 25 grade concrete is:
The workability of concrete can be increased by which of the following?