App Logo

No.1 PSC Learning App

1M+ Downloads
Seepage loss from irrigation canals can be reduced by

AClosing down the canal

BLining the canal

CIntroducing the intercepting drains

DNone of these

Answer:

B. Lining the canal


Related Questions:

The margin between crest of a dam or canal bank and full supply level is:
Free Board in a dam is
An underground passage or tunnel to permit the movement of traffic, or to accommodate service, pipes, cables, sewers, etc.
Under which group, does waviness in surface falls?
One of the most commonly used formula for computing the discharge over sharp or narrow crested weirs with or with out end contraction is: