Challenger App

No.1 PSC Learning App

1M+ Downloads
Seepage loss from irrigation canals can be reduced by

AClosing down the canal

BLining the canal

CIntroducing the intercepting drains

DNone of these

Answer:

B. Lining the canal


Related Questions:

The longitudinal passage left on the body of the masonry dam for inspection and collection of seepage water is:
The distance between the top of the canal bank and top edge of the cutting is termed as
For an open channel flow to takes place b/w two sections:
The difference of water level in the head race and in the tail race a hydroelectric project is known as
The top of a weir or spillway, is