App Logo

No.1 PSC Learning App

1M+ Downloads
Sewerage system is designed for:

AMaximum flow only

BMinimum flow only

CAverage flow only

DMaximum and minimum flow

Answer:

D. Maximum and minimum flow


Related Questions:

The length of one link in Engineering surveys chain should be
Which instrument is used forsetting out right angles?
A line joining the optical center of the object glass and the center of the eyepiece is called
Which of the following one is example for surface source:
A___ set of arrows located on the side of a text box.