App Logo

No.1 PSC Learning App

1M+ Downloads
Staff reading taken on a point whose elevation is to be determined on a changepoint is called

ABacksight reading

BIntermediate reading

CInvert reading

DFore sight reading

Answer:

D. Fore sight reading


Related Questions:

The device which used to maintain speed at varying load condition
Nicotine is a:
Which of the following is a first order lever
The slope at both ends, of a fixed beam,will be
To find out the area of irregular figures using Simpson's Rule, divide the figure into even number of parallel strips by means of