App Logo

No.1 PSC Learning App

1M+ Downloads
The amount charged by the engineering department to meet the expense of designing, planning,supervision etc for a work of another department is called:

AContingencies

BCentage charges

CWork charged establishment

Dcontractor profit

Answer:

B. Centage charges


Related Questions:

As the voltage of transmission increases, the volume of conductor :
The horizontal course provided to strengthen a wall of irregular small stone is known as:
For repetitive type projects, the mostly used network technique is
The area in which a crop is grown at a particular time or crop season is known as
The string of a kite is 150 m long and it makes 30° to the horizontal. Find height of the kite