Challenger App

No.1 PSC Learning App

1M+ Downloads
The built up covered area of building at floor level of any storey is

AFloor area

BCirculation

CPlinth area

DBuilt up area

Answer:

C. Plinth area


Related Questions:

Compression members always tend to buckle direction of the
Irrigation with sewage from a town is:
A simply supported beam deflects by 5 mm when it is subjected to a concentrated load of 10 kN at its centre. What will be deflection in a 1/10 model of the beam if the model is subjected to a 1 kN load at its centre?
Steam curing accelerates attainment of strength in concrete because
The B.M diagram of a fixed beam is obtained by superimposing its