App Logo

No.1 PSC Learning App

1M+ Downloads
The built up covered area of building measured at the floor level of any storey

AFloor area

BCirculation area

CPlinth area

DLivable area

Answer:

C. Plinth area


Related Questions:

"Scuffing" occurs when :
Loss of head at entrance to a pipe is
Scalene triangle is a triangle
What are the forces involved in hygroscopic water or contact moisture?
The process which specifies what the right and left hands of the worker was doing is known