App Logo

No.1 PSC Learning App

1M+ Downloads
The coordination number of fcc structure is

A12

B16

C8

D4

Answer:

A. 12


Related Questions:

In a traverse the angle measured clockwise from the preceding survey line to the following survey line is called
Minimum width of a habitable room:
Relation between gradient and camber:
Magnetic bearing of a line AB is S.32° E.What is the true bearing of the line, when the declination is 8° 16'
The correction for sag is :